Wonikholdings

  • 페이스북
  • 트위터
  • 블로그

SPECIAL INFORMATION
  • Total Floor

    B1, 5F

  • Gross Area(m2)

    24,752.82

It was designed as a ‘practical integrated workplace.’ We integrated the reduced office area and a factory building in the previous design plan, which separated buildings, and increased its presence using the image of a single mass connected to the site (planned) for Phase 2 of the project. By applying a specialized design, which modulated the louvers of the office building, we formed a rhythmic façade and reduced the amount of insolation.

PROJECT INFORMATION
Location
Gyeonggi-do
Site Area
16,528.00㎡
Gross Floor Area
24,752.82㎡
Building Area
6,906.28㎡
Total Floor
B1, 5F
Design Year
2019
Completion Year
2020
  • 한화

  • 파라다이스

  • 삼성

  • LG

  • Doosan

  • 셀트리온

  • 국민은행

  • 고려대학교의료원

  • 연세대학교의료원

  • 카톨릭대학교서울성모병원

  • YG엔터

  • 하나은행

  • 미래에셋

  • 서울대학병원

  • 한국항공공사

  • 서울특별시

  • 현대해상

  • 기업은행

  • 대웅제약

  • 이지스자산운용

  • 한화

  • 파라다이스

  • 삼성

  • LG

  • Doosan

  • 셀트리온

  • 국민은행

  • 고려대학교의료원

  • 연세대학교의료원

  • 카톨릭대학교서울성모병원

  • YG엔터

  • 하나은행

  • 미래에셋

  • 서울대학병원

  • 한국항공공사

  • 서울특별시

  • 현대해상

  • 기업은행

  • 대웅제약

  • 이지스자산운용